Thursday, February 14, 2002

Neighborhood carries on as Gorman is charged with murder

Published in the Current; co-written with Brendan Moran and Kate Irish Collins

A grand jury indicted Jeffrey Gorman, 22, of Scarborough, for the murder of Amy St. Laurent Feb. 8, nearly two months after searchers discovered her body less than a half of a mile from his house.

Even though a small corner of Scarborough has become the center of an investigation into a murder police have called “sadistic” and “vicious,” neighbors say it hasn’t changed the way they feel about their neighborhood along County Road.

“We’re not that far from Portland,” said David Knight, who lives a half mile west of where the body was discovered. “Nothing really surprises us anymore.”

Knight’s family owns Smiling Hill Farm, which borders the Westbrook town line on County Road. He used to fish down at the pond where police spent weeks searching for evidence.

A yellow strand of police tape is still strung across the narrow dirt road that leads back into the vacant, wooded lot. The road is now buried under a deep layer of snow.

When asked if he will still fish back at the pond, Knight doesn’t hesitate. “Oh, yeah,” said Knight, “actually, I’ve been back there since.”

Knight’s mother owns land adjacent to the wooded area. One day their curiosity got the best of them. Knight and his mother walked toward the pond to see how close it was to her land.

But for one neighbor, the woods are too close. Wanda Donovan lives right next to the woods where St. Laurent’s body was discovered.

“I’m trying not to think about it too much,” she told the Current in December.

Most of the neighbors were as surprised as anyone by the discovery. They saw the searchers and heard the helicopters flying low above their neighborhood. But the police hadn’t told them why they were searching the area.

The next thing they knew it was all over the news. Television news crews were stopping along County Road to get footage of the wooded\ lot and the house at 68 County Road, where Gorman lived with his mother.

His mother has refused all requests for interviews. The house has since been posted with “keep out” and “private property” signs.

“I haven’t really thought of it that much,” said Don Cook, the owner of the First Stop convenience store, a half of a mile east of 68 County Road. “The news is right full of it. It’s too bad it’s happened.”

Cook recognized Gorman when he saw him on the news. Cook gave Gorman a job a couple years ago. It didn’t last long. After a couple of weeks, Gorman either didn’t show up or was fired. Cook can’t remember which.

The murder hasn’t altered Cook’s perception of the neighborhood where he’s done business for years. “Pick up the morning paper. It’s everywhere. It could have just as easily happened here as in-town Portland.”

Gorman, who spent most of his life in Alabama until moving to Scarborough two years ago, appeared in court on murder charges Tuesday. He walked into the courtroom shackled and wearing a yellow jumpsuit, the color worn by maximum-security prisoners. He slouched low in his chair until he was called in front of Chief Justice Nancy Mills to enter his plea of “not guilty.”

Later this month, Gorman will return to court for a bail hearing. He is being held without bail until around March 3 for violating his probation on unrelated charges.

His lawyer, Clifford Strike, has yet to see any of the evidence against Gorman. On request from Strike, Mills granted Gorman permission to change his plea once he has seen the evidence against him, leaving open the possibility that Gorman could change his plea.

Police have withheld much of the evidence against Gorman. Questions remain: How was St. Laurent killed and where? Did Gorman act alone? What were police searching for in the pond?

“This was a horrible, sadistic, vicious murder of Amy St. Laurent,” said Portland Police Chief Michael Chitwood. When the cause of death is released, “the public will be outraged.”

“It’s not part of the process to make this information public and I want to keep it that way,” said Assistant Attorney General Bill Stokes.

Chitwood told the Current in December that the police were looking for a murderer and others who may have helped conceal the crime. But Friday, he said the police now believe Gorman acted alone.

State Police Sgt. Matthew Stewart refused to comment on whether police had any other suspects Tuesday. “I’m not going to make any comment about the investigation,” said Stewart. “At this point, Mr. Gorman is the only one that’s being charged in the case.”

“I know the public is very interested in this case,” said Stokes. “But they have to be content to let the judicial process take its course. The process we have may not be as quick as people may want it to be.”

Stokes said that his team is trying hard to get murder cases to trial between nine and 12 months. “We should be bringing the case toward the end of this year, the first of next year,” Stokes said.

Cape reassessment to begin mid-March

Published in the Current

For the first time in eight years, Cape Elizabeth property owners will have their land and buildings assessed by the town for tax purposes.

Many homes will see higher assessments, though Town Assessor Matt Sturgis said he expects some property values to remain unchanged and others to decrease.

“We’ll try to bring properties in Cape Elizabeth up to full market value,” he said.

At the Town Council meeting Feb. 11, Sturgis outlined the plan for the reassessment. The project will begin in mid-March and continue through the spring, summer and fall. Data will be compiled by May or June 2003,
and adjustment hearings will be scheduled for property owners who want to correct errors on their assessments. In late July 2003, the assessments will be fixed and tax bills should go out in the first week of August 2003, Sturgis said.

Assessors will be knocking on doors around town asking to look through homes, to check for improvements like finished basements or other internal modifications that would affect value. If no one is home, assessors will be
inspecting land and building exteriors and attempting to schedule return visits to see inside homes.

Sturgis said homeowners are not required to permit assessors into their homes or onto their property, but if they don’t allow them in, the law says the owners give up their right to appeal the amount of an assessment.

“The hardest part of the whole project is determining the land values,” he said.

Some types of property may see bigger increases than others, Sturgis said. For example, the assessed value of most shorefront property in 1999 was about 65 percent of the market value for those properties.

But by 2001, Sturgis said, the market value had increased so that the assessment was about 44 percent of market value.

“It’s a pretty significant drop,” Sturgis said.

Lower-value homes may see less change than some of the higher-end homes in town, he said. And newly built homes are unlikely to change much either, Sturgis said, since those were assessed when they were built and have had little time to change.

Sturgis noted that there are two parts to property tax bills: the assessment value and the tax rate, which is set by the Town Council. He also said exemptions for homesteads or veteran status will continue and residents do not need to reapply for them.

He said any residents with questions or concerns should call his office at 799-1619, though he said he won’t be able to answer the question on every resident’s lips: “What will my assessment value be?”

Monday, February 11, 2002

Fairchild responds to marketplace shift, moves to LVDS

Published in Interface Tech News

SOUTH PORTLAND, Maine ‹ Reacting to the increased prevalence of low voltage differential signaling (LVDS) as a device-communication protocol, Fairchild Semiconductor is now manufacturing a high-speed crosspoint switch for use as a building block of more complex devices.

"Our role on this is low functionality, high performance," said Paul Kierstead, Fairchild's interface marketing director.

Fairchild spun out of Santa Clara, Calif.-based National Semiconductor five years ago and aimed for the niche of simple, high-performance components to be used as elements of a wide variety of electronic equipment.

Getting data moving at higher rates between devices in networking equipment is an important factor in expanding overall throughput.

With the older transistor-transistor logic (TTL) bus technology, in which data is broadcast to all devices on the bus, Kierstead said, "You've got to get wider to get faster."

LVDS, by contrast, operates over pairs of wires directly connecting components. The receiver looks at the difference between the two signals, allowing for noise to be eliminated from the transmission. While it does require two wires where before one would suffice, Kierstead said, it can reach speeds of 622 megabits per second, as compared with 64-bit bus speeds.

Fairchild's new switch converts between TTL and LVDS, Kierstead said, allowing manufacturers to choose the best mix of technologies for their purposes. "It really begins to tie the signaling level issues together," he said.

The crosspoint nature of the switch improves its versatility, he said. "It allows you to have multiple inputs that are switchable and routable to multiple outputs," Kierstead said.

With only two ports, it is small, but faster and easier to manage than some of its larger competitors, which get as big as 128 pairs in and out, Kierstead said.

"This is the building block of the crosspoint switch," he said. Fairchild will start from this base, he added, and move to larger arrays of switches with additional functionality. He noted that the company plans to move into packet-oriented switches, as well.

Fairchild is also working on optimizing power consumption, and sees that area as a major opportunity for growth.

Analyst Charles Mantel, vice president of Mountain View, Calif.-based Selantek, said Fairchild seems to be holding up well.

"Nobody's had a great time of it," Mantel said, but Fairchild is not doing as badly as some of its competitors. "They went less downhill than many companies," he said.

Thursday, February 7, 2002

YMCA asks: Is Scarborough a good home?

Published in the Current

It will be months before Scarborough knows if it is a good match for the Y, and if so, years before anything gets built, organizers and Y officials said.

But within two months, Y organizers could be asking town residents for as much as $300,000 to further develop the project.

According to Dave Thompson, executive director of the Greater Portland YMCA, it will be at least six weeks before a study of Scarborough’s feasibility as a host community for a YMCA will be complete, and another six weeks or so before the analysis of that information is completed by the national Yorganization.

If a Y is approved, supporters will be looking for between $250,000 and $300,000 to offer some Y services in town, and to begin planning a capital campaign that could take two years to kick off, and which could last as long as five years.

Two representatives from the national YMCA office were in Scarborough this week conducting interviews with community leaders, including Town Manager Ron Owens and members of the volunteer group that approached the Y to bring a facility to town.

Those being interviewed had been identified by members of the community as people who know the town, and who could potentially help gather support for a Y, if one were to be located here.

The study is examining the fund-raising prospects as well as projecting numbers of annual members. It also looks at the size of the community it would serve – beyond just the town limits of Scarborough – and need for the services a Y could provide, such as child care, elder programs and a pool.

Another key criterion is whether there would be additional contributions available each year, to keep the organization going. “A well-run YMCA typically generates about 20 percent of its income from contributions,” Thompson said.

The survey will be complete in another few weeks, after which the national Y organization will look at the information and issue a report on whether the project should go forward.

Thompson said that aside from saying just “yes” or “no,” the report could include analysis of specific risks, such as the high household turnover in Scarborough.

And then the preparation for a major fund-raising project would begin. “We wouldn’t be ready for a capital campaign for two or three years,” Thompson said. But the momentum is already building, according to Mike Harrison, a representative of the national Y organization who coordinates projects in Maine and New Hampshire.

YMCAs built in Maine tend to cost between the $9 million spent for a new Y in Camden and the smaller $4.5 million building in Bath, Harrison said. Both the Camden and Bath buildings have a small, therapeutic pool and a larger, eight-lane lap pool, he said.

In the meantime, Thompson said, the Cumberland County YMCA could start offering programs in borrowed or rented space, like church basements or school gymnasiums.

When it came to putting up a building, Thompson said, groundwork laid now with the town will prove useful. “There has to be a strong relationship with the town,” he said.

To that end, he and other Y professionals have spoken with Owens and Community Services Director Bruce Gullifer, with positive interaction.

“They’re very receptive to the idea,” Thompson said. “Having them support the idea just makes things work so much better.”

Thompson stressed that the process is designed to be objective and examine the realistic possibilities of success for a Y in Scarborough. “We want to take this very seriously, but not let emotions get carried away here,” he said.

Cape planning $5-million-plus school renovations

Published in the Current

The Cape Elizabeth School Board and Town Council officially discussed for the first time this past week the construction and renovation projects slated for the town’s schools – a project estimated to cost between $5 and $6 million.

Councilors will be asked to approve a plan that would have working beginning at both Pond Cove and the high school in the summer of 2003.

And though funds have yet to be approved, and plans are not yet even in draft form, architect Bob Howe, of HKTA in Portland, has been visiting the Cape Elizabeth schools to explore the buildings and learn from school staff about issues that should be addressed during the renovation.

The school renovation has as its ultimate goal the grouping of grades together, with kindergarten through fourth grade at Pond Cove, fifth through eighth grades at the Middle School, and grades nine through 12 at the high school, Howe said.

Right now, the kindergarten is in the high school, occupying space that will be needed in coming years. To keep the grades together in the future, Howe said, the kindergarten needs a new home.

“That has a domino effect,” Howe said. More classroom space is needed at Pond Cove to accommodate the kindergarten, and additional renovations will
be done to the high school as well. At minimum, the classrooms now serving the kindergarten will need to be updated for teaching high school students.

Howe and Marie Prager, a member of the School Board and chair of its Building Committee, said it is about time for the 33-year-old school building to be renovated anyway, though it appears to be in good shape for its age.

Howe is talking to teachers and administrators at the high school to learn about their concerns and recommendations for the work.

During a recent walk-through at the high school, Howe said there are some basic issues, like making sure windows don’t leak.

And there is definitely a need for improvements to the science classrooms, including adding another physics classroom, so the school will have two.

The existing science classrooms need to be reconfigured and have better access to sinks and other facilities for lab work, as well as being adaptable for use as lecture space.

But in other areas of the school, some teachers are fine with the space they have, while others want more space or a different configuration. The language teachers, for example, are happy with the amount of space they have, but would prefer it not be split across two floors of the school, Howe said.

There is also need for at least one additional computer room, Howe said, and some teachers have asked him for a space for students to congregate.

Other requests have included space for one-on-one work and small group activities, Howe said.

And some issues are related to changes in educational methods since the school was built. For example, the cafeteria was built to handle fewer students at one time than are currently using the room. To provide a nicer eating place without significant changes to the class schedule will require a larger cafeteria, Howe said.

“Students are eating in the halls,” he said.

The music stage and gym floor are also getting examined. The gym can only be sanded once more before the floor needs to be replaced. And the wood is laid directly on concrete.

“It’s hard on players’ legs,” Howe said. But a replacement floor would raise the floor level about three inches, causing problems at the gym doors. Locker rooms, too, need work, with better ventilation and aesthetic improvements that would make people more likely to use them, Howe said.

The front entry to the high school also needs attention. The slope from the parking lot up to the doors is steeper than the Maine Human Rights Act allows. That act adopts the standards of the federal Americans with Disabilities Act for buildings in Maine, Howe said.

Parking on the site is an issue as well, Howe and Prager said. One possible location for additional parking spaces is the flat grassy area behind the building, which is now used informally for extra parking, especially for sporting events.

The building’s infrastructure also needs attention, though fortunately not much of the major systems. “If we had to redo the entire mechanical systems in here, I don’t think the town could afford it,” Howe said.

But some updating of the air circulation system and additional plumbing may be needed, as well as telecommunications wiring, to put phones in each classroom, for example.

Prager stressed that this process is just beginning. After Howe has met with the groups at the high school, he will report to the Building Committee, which will work with him to figure out what work needs to be done and sort out priorities and costs for the projects.

Also in the early planning phase is the Pond Cove construction. The work at the two schools is expected to cost between $5 million and $6 million, Prager said. A final figure should be available by the end of the school year, she said.